When a business plans to buy commercial refrigerators or freezers, one of the first steps is to contact suppliers and ask for prices. But a short message such as “Please quote your best price for 20 commercial refrigerators” does not give a supplier enough information to prepare a useful offer.
The supplier may not know which type of refrigerator you need, where the equipment will be used, what temperature it must hold, or where the order will be delivered. One supplier may quote a basic model, while another may quote a larger unit with different features. Both prices may look correct, but they are not based on the same requirements.
This is why buyers should prepare a Request for Quotation, often called an RFQ.
An RFQ is a document or structured request that tells suppliers what a business wants to buy. It gives them the information they need to prepare a quotation. It also gives the buyer a clear way to compare offers.
For commercial refrigeration projects, a good RFQ should cover more than product names and quantities. It should explain how the equipment will be used, what performance is required, which features matter, and how the order should be delivered.
This guide explains what to include in a commercial refrigeration RFQ, how to organize the information, and how to use supplier replies to make a better buying decision.
What Is a Commercial Refrigeration RFQ?
A Request for Quotation is a formal request sent to one or more suppliers. It asks them to provide prices and other order details for products or services that match the buyer’s requirements.
In simple terms, an RFQ tells a supplier:
- What equipment do you need?
- How many units do you plan to buy?
- What must the equipment do?
- Where will it be installed or used?
- Where should the supplier deliver it?
- When do you need it?
- What information should the supplier include in the quotation?
The supplier uses these details to select suitable models, check availability, estimate costs, and prepare an offer.
An RFQ is not the same as a purchase order. An RFQ asks suppliers to quote. A purchase order is issued later, after the buyer has reviewed and approved the offer and is ready to place the order.
It is also different from a general product inquiry. A first inquiry can be brief. It may ask whether a supplier makes a certain type of freezer or whether a product can be customized. An RFQ should be more complete because the buyer is asking for a price that can be reviewed and compared.
Why does an RFQ matter?
A clear RFQ helps both sides.
For the buyer, it can:
- Reduce misunderstandings about the equipment.
- Make supplier quotations easier to compare.
- Help the team check whether a product fits the site and application.
- Show which costs are included and which are not.
- Reduce the risk of missing details before an order is placed.
- Create a written record of the requirements.
For the supplier, it can:
- Make the project easier to understand.
- Help the sales team select suitable models.
- Reduce repeated questions.
- Support a more accurate quotation.
- Help the supplier check production, packaging, and delivery needs.
The goal is not to create a long document for every purchase. The goal is to provide enough information for suppliers to quote the right equipment on a clear and consistent basis.
Start with Basic Project Information
Before listing the equipment, give suppliers a short overview of the project.
This information helps them understand who is buying, where the equipment will be used, and what the project is expected to achieve.
Your project overview does not need to be long. A few clear lines are often enough.
Company and buyer information
Include:
- Company name.
- Main business activity.
- Country and city.
- Contact person.
- Email address.
- Phone or messaging contact, if needed.
- Company website, if available.
For example, a supermarket operator, restaurant group, food distributor, and hotel purchasing team may all need commercial refrigeration. But their equipment needs can be very different.
A supplier may need to know whether the buyer is:
- A supermarket or grocery store.
- A restaurant or commercial kitchen.
- A hotel or catering business.
- A convenience store.
- A food and beverage distributor.
- A refrigeration equipment wholesaler or dealer.
- A contractor or project company.
This background gives the supplier a better starting point.
Project type
Explain what the purchase is for.
Is it a new store, a new restaurant, a warehouse, a hotel kitchen, or a replacement project? Is it a one-time order or part of a wider rollout?
The project type can affect the product selection, quantity, delivery plan, and timing.
For example, a new supermarket may need several types of display refrigerators, upright freezers, and storage equipment. A restaurant may need under-counter refrigerators, worktop units, and kitchen freezers.
A replacement project may have a different concern. The new equipment may need to fit the space and electrical setup already in place.
Project stage
Tell the supplier how far the project has progressed.
You can use a simple description:
- Early planning.
- Site design in progress.
- Equipment list prepared.
- Final dimensions available.
- Budget review.
- Ready for supplier quotation.
- Ready for order approval.
This helps the supplier understand which details are fixed and which may change.
If your site drawings are still being prepared, say so. If the quantities are estimates, mark them as estimates. Clear notes are better than presenting unfinished details as final facts.
List Each Equipment Type Clearly
The equipment list is one of the most important parts of an RFQ.
| Item | Equipment Type | Model or Description | Quantity | Application or Location | Special Requirements |
|---|---|---|---|---|---|
| 01 | Commercial Display Refrigerator | Model or preferred specifications | Enter quantity | Supermarket beverage section | Glass doors, LED lighting |
| 02 | Commercial Chest Freezer | Model or preferred specifications | Enter quantity | Retail frozen food area | Sliding glass lids |
| 03 | Commercial Upright Freezer | Model or preferred specifications | Enter quantity | Restaurant storage room | Adjustable shelves |
Avoid using only broad names such as “commercial fridge,” “freezer,” or “display cabinet.” These names can refer to many different products.
A supplier needs to understand the type of equipment you are asking for.
Use clear product categories
Depending on the project, your RFQ may include:
- Upright commercial refrigerators.
- Upright commercial freezers.
- Glass-door display refrigerators.
- Glass-door display freezers.
- Undercounter refrigerators.
- Worktop refrigerators.
- Back-bar coolers.
- Bottle coolers.
- Chest freezers.
- Island freezers.
- Deli display cases.
- Cake display refrigerators.
- Refrigerated preparation counters.
- Walk-in coolers or freezers.
These categories are not interchangeable. A glass-door display refrigerator is designed for product display and access. An undercounter refrigerator is designed to fit below a work surface. A chest freezer has a different layout and access method from an upright freezer.
If you know the product category, name it directly.
If you do not know the exact category, describe the job the equipment must do. For example:
“We need a refrigerator for drinks in a convenience store. Customers should be able to see the products through the door and take them from the front.”
This gives the supplier a useful starting point without forcing the buyer to know every technical term.
Separate different products into separate lines
Do not combine several equipment types into one line.
For example, avoid writing:
“20 refrigerators and freezers.”
Instead, create separate lines:
- Glass-door display refrigerators — estimated 12 units.
- Upright commercial freezers — estimated 4 units.
- Undercounter refrigerators — estimated 4 units.
This makes it easier to identify the model, quantity, and price for each type.
If the project includes different sizes or configurations within one category, list them separately as well.
Provide Dimensions and Capacity Requirements
Dimensions and capacity help suppliers check whether the equipment will fit the site and hold the required products.
| Requirement | Buyer Information | Unit | Additional Notes |
|---|---|---|---|
| Width | Enter required width | mm | Maximum available width |
| Depth | Enter required depth | mm | Include any site limitations |
| Height | Enter required height | mm | Consider ceiling and access limits |
| Storage Capacity | Enter target capacity | L or m³ | State usable or total capacity if known |
| Door Configuration | Enter door quantity and type | Doors | Sliding, hinged, or open-front |
| Shelf Configuration | Enter shelf quantity and layout | Shelves | Include adjustable shelf requirements |
| Installation Clearance | Enter available clearance | mm | Allow for ventilation and servicing |
A product may look suitable in a catalogue but still be too wide, too tall, or too deep for the planned location.
External dimensions
If you have the required dimensions, include:
- Width.
- Depth.
- Height.
- Available installation space.
- Door opening space, where relevant.
- Access route into the building.
Always state the unit of measurement. For example, use millimetres (mm) or inches (in). Do not mix units without making the difference clear.
Also explain whether the dimensions are:
- Maximum allowed dimensions.
- Preferred dimensions.
- Existing equipment dimensions.
- Preliminary site measurements.
This matters because a maximum size is a limit, while a preferred size may allow some flexibility.
If the site is not ready, provide the information you have and mark it as preliminary. Ask the supplier to show the proposed product dimensions in the quotation or product specification.
Capacity and storage needs
Capacity is another point that should be clear.
A buyer may describe capacity in litres, cubic feet, or the amount of product that needs to be stored. The supplier should know which measure is being used.
For example, a buyer may need:
- A refrigerator with a certain internal volume.
- A freezer that can hold a planned amount of frozen food.
- A display unit with enough shelf space for a product range.
- A storage unit for boxes, trays, or containers.
Do not rely on external dimensions alone. Two products with similar outside sizes may have different internal layouts and usable storage space.
If you have a target capacity, include it. If you do not, describe the products, packaging, or storage needs and ask the supplier to recommend a suitable size.
Shelf and interior layout
For display and storage equipment, the inside layout can be just as important as the outside size.
Tell the supplier whether you need:
- Adjustable shelves.
- Fixed shelves.
- Wire shelves.
- Solid shelves.
- Product trays.
- A certain number of shelf levels.
- A special storage arrangement.
If the product has unusual packaging or needs a special display position, include a photo or simple drawing.
A clear visual reference can help prevent a supplier from choosing a layout that does not suit the products.
Explain the Application and Operating Conditions
The same type of refrigerator may be used in very different environments.
A unit in a cool storage room may face different conditions from one in a busy kitchen. A display refrigerator near a store entrance may be exposed to warm air each time the door opens.
Your RFQ should explain where and how the equipment will operate.
Where will the equipment be used?
State the intended location:
- Supermarket sales floor.
- Convenience store.
- Restaurant kitchen.
- Hotel kitchen.
- Food preparation area.
- Beverage display area.
- Storage room.
- Distribution facility.
- Other commercial setting.
If the equipment will be placed outdoors or in a semi-outdoor area, say so. Do not assume that an indoor model is suitable for every location.
Ambient temperature and ventilation
Ambient temperature means the temperature of the air around the equipment.
This is important because refrigeration equipment must remove heat from the products and from the cabinet. The surrounding environment can affect how the equipment operates.
If the room is often hot, has poor ventilation, or is close to ovens and cooking equipment, include that information.
Also explain whether the equipment will have enough space around it for airflow and service access.
Do not guess the required clearance. Ask the supplier to provide the installation guidance for the proposed model.
Door opening and daily use
Describe how often the equipment will be used.
For example:
- Will customers open the doors many times each hour?
- Will staff load products several times a day?
- Will the doors stay open during restocking?
- Will the equipment operate around the clock?
- Will it be used in a high-traffic area?
These details help the supplier understand the operating conditions.
A display unit in a busy shop may face frequent door openings. A storage freezer may have fewer openings but may need to hold a large amount of frozen stock.
The supplier should know how the equipment will be used, not just where it will stand.
State the Required Temperature
Temperature is a key part of a commercial refrigeration RFQ.
| Application | Products to Be Stored | Required Temperature Range | Operating Conditions | Additional Requirements |
|---|---|---|---|---|
| Supermarket Display | Beverages, dairy products, or fresh food | Enter required range | Frequent door opening and customer access | Stable display temperature |
| Frozen Food Retail | Frozen food and packaged products | Enter required range | Retail environment with regular access | Consistent frozen storage conditions |
| Restaurant Kitchen | Meat, seafood, vegetables, or prepared food | Enter required range | Frequent staff access | Suitable for daily kitchen operations |
| Cold Storage Room | Bulk chilled or frozen products | Enter required range | Room size, loading frequency, and product volume | Temperature monitoring requirements |
A buyer should not simply write “cold enough” or “standard freezer temperature.” The required temperature depends on the product being stored and the business's operating rules.
Refrigerator or freezer?
First, state whether you need:
- Chilled storage.
- Frozen storage.
- Separate chilled and frozen compartments.
- A product with more than one temperature zone.
If you need different temperatures in separate compartments, describe each zone.
Required operating temperature
Give the target temperature or temperature range where possible.
For example:
- Chilled products: specify the target range required by your product and local food-safety rules.
- Frozen products: specify the target range required by your product and local food-safety rules.
Do not use a general example as a replacement for local food-safety requirements. Different foods, markets, and rules may have different temperature limits.
The U.S. ENERGY STAR commercial refrigeration criteria describe test conditions for certain product classes, including medium-temperature and low-temperature equipment. These rating categories help identify the equipment class, but they do not replace the buyer's own storage and food-safety requirements.
Holding temperature or pull-down needs
It is also useful to explain whether the equipment will mainly hold products at an existing temperature or whether it must cool products from a warmer starting temperature.
These are different tasks.
If the equipment is expected to cool warm products quickly, tell the supplier. Do not assume that every storage refrigerator is designed for rapid cooling.
If you are not sure how to describe the requirement, explain the daily process and ask the supplier to confirm whether the proposed model is suitable.
Include Electrical and Installation Information
Electrical details should be included before the supplier prepares the final quotation.
| Information | Buyer Details | Example or Guidance |
|---|---|---|
| Destination Country | Enter destination market | United States, Australia, Germany, etc. |
| Supply Voltage | Enter required voltage | For example, 110V, 220V, or 230V |
| Frequency | Enter required frequency | 50Hz or 60Hz |
| Power Phase | Enter required phase | Single-phase or three-phase |
| Plug or Power Connection | Enter local connection requirements | Specify plug type if applicable |
| Installation Location | Enter indoor or outdoor location | Kitchen, retail floor, storage room, etc. |
| Ventilation Space | Enter available space around the unit | Include rear and side clearance |
| Drainage | State whether drainage is available | Relevant to certain equipment and installation setups |
| Site Access | Enter door, lift, and corridor dimensions | Important for delivery and equipment placement |
A product may be suitable in size and capacity but still be unsuitable for the site's power supply.
Power supply
Where known, provide:
- Voltage.
- Frequency.
- Phase.
- Plug type or socket requirement.
- Any local electrical requirements.
For example, a project may use a 220–240 V supply at 50 Hz, while another market may use a different voltage and frequency.
Do not assume that the supplier will know the correct setup from the destination country alone. Buildings and project requirements can vary.
If you do not know the exact electrical details, ask your electrician or site team to confirm them. Mark unknown details clearly in the RFQ.
Plug and connection requirements
Tell the supplier whether the equipment should be supplied with a local plug, a specific cable arrangement, or another connection type.
The supplier should confirm what is included in the offer.
For larger or remote refrigeration systems, the installation and connection details may be more complex. In these cases, the RFQ should explain the project setup and ask the supplier to state the required site connections.
Self-contained or remote refrigeration
Some commercial refrigeration products have a refrigeration system built into the unit. Others use a remote condensing unit.
A self-contained unit has its main refrigeration components built into the equipment. A remote system places some components away from the refrigerated cabinet.
The choice can affect installation, heat rejection, noise, service access, and project coordination.
If the project already has a remote system or a planned equipment layout, include the relevant details. If you are unsure which setup is suitable, explain the site conditions and ask the supplier to recommend an option.
The U.S. Department of Energy's commercial refrigeration guidance distinguishes equipment connected to self-contained and remote condensing units. This is one reason an RFQ should identify the equipment arrangement rather than rely only on a general product name.
List the Features and Options You Need
Features can affect the product selection and quotation price.
Instead of asking for “all available options,” list the features that matter to your project.
Door type
State whether you need:
- Solid doors.
- Glass doors.
- Sliding doors.
- Hinged doors.
- Open display access.
The door type affects how customers or staff access the products. It can also affect display, layout, and energy use.
Lighting and display
For display equipment, tell the supplier whether you need:
- Interior LED lighting.
- A specific light position.
- Product display shelves.
- Price tag holders.
- Advertising panels.
- Special display arrangements.
If branding or display appearance is important, include reference images or drawings.
Controls and monitoring
Explain whether you need:
- Digital temperature display.
- Adjustable temperature control.
- Temperature alarms.
- Remote monitoring.
- Data logging.
- Door alarms.
Do not list a feature just because it sounds useful. Think about who will use it and what problem it needs to solve.
For example, a temperature alarm may help staff notice an operating issue. Remote monitoring may be useful for a site with many units or limited staff presence.
Ask the supplier to explain whether the feature is built into the model or supplied as an option.
Mobility and access
If the equipment needs to move during cleaning or layout changes, state whether you need castors or another mobility feature.
Also mention any special access needs, such as a narrow doorway, lift size, or loading area limit.
Explain Customization and Branding Requirements
Some projects need equipment that is different from standard catalogue models.
If customization is required, describe it as clearly as possible.
Possible requirements include:
- External dimensions.
- Colour.
- Logo placement.
- Door design.
- Shelf layout.
- Interior materials.
- Display arrangement.
- Accessories.
- Packaging or labeling.
Separate required changes from optional ideas.
For example:
Required: The cabinet must fit within the available width.
Preferred: The exterior should match the store's brand colour.
This helps the supplier understand which changes are necessary and which can be discussed later.
Provide drawings and reference images
A photo, sketch, or drawing can help explain a customization request.
Add notes to show:
- Which part needs to change.
- The required measurement.
- The preferred material or colour.
- The position of the logo.
- Any part that must remain unchanged.
If a drawing is not final, label it as a reference rather than an approved production drawing.
Ask the supplier to confirm feasibility
Do not assume every requested change is possible.
Ask the supplier to confirm:
- Whether the change can be made.
- Whether it affects the product's performance.
- Whether it changes the price.
- Whether it affects the production time.
- Whether a sample or drawing approval is needed.
A written reply is important. It helps both sides agree on what is included before the order is placed.
State the Quantity and Order Plan
Quantity affects the quotation, production plan, packaging, and shipping arrangement.
Your RFQ should show the quantity for each product line.
If the order is not final, say so.
Estimated and confirmed quantities
Use clear labels:
- Estimated quantity.
- Initial order quantity.
- Confirmed order quantity.
- Possible future quantity.
For example, you may expect to buy 30 units for a new store project, but the final number may change after the site layout is approved.
Tell the supplier which quantity should be used for the first quotation.
If you expect to place more orders later, explain that too. Do not present a possible future order as a confirmed purchase.
One shipment or several deliveries?
State whether the order should be delivered:
- In one shipment.
- In several batches.
- To one location.
- To more than one location.
If different stores or project sites need different quantities, list them separately.
This helps the supplier and logistics team understand the delivery plan.
Minimum order quantity
If you are asking about a small order or a mixed product order, ask the supplier to confirm any minimum order quantity (MOQ).
MOQ means the smallest quantity a supplier is willing to accept for a product or order. It may vary by model, customization, or production arrangement.
Do not assume that all products have the same MOQ.
Provide the Destination and Delivery Requirements
A quotation for export equipment should clearly state where the goods need to go.
The destination can affect freight costs, shipping options, documents, and delivery time.
Destination details
Provide:
- Country.
- City.
- Port, if known.
- Delivery address or project location, if available.
- Whether the goods will go to a port, warehouse, or final site.
If you do not know the final address, provide the best available destination information and mark it as provisional.
Shipping terms
If you already have a preferred shipping term, include it in the RFQ.
If you are not sure, ask the supplier to quote based on a clearly named option and explain what is included.
For international orders, terms such as EXW, FOB, CIF, and DAP can affect which party arranges transport, pays certain costs, and takes on specific risks.
Do not write only “shipping included.” Ask the supplier to state the exact Incoterm and named place or port.
The buyer and supplier should use the same shipping basis when comparing quotations. A lower equipment price may not mean a lower total landed cost if the shipping scope is different.
Packaging requirements
Commercial refrigeration equipment may need special packaging to protect cabinets, doors, glass, and other parts during transport.
State whether you need:
- Export packaging.
- Wooden crates.
- Pallet packaging.
- Protective corner materials.
- Moisture protection.
- Special labels or handling marks.
Ask the supplier to explain the packaging included in the quotation.
If the goods will be shipped in a container, ask whether the proposed packing plan is suitable for the shipping method.
Set the Required Schedule
A supplier needs to know when you expect the order to be ready and when it should arrive.
Include:
- Target order date.
- Required shipment date, if known.
- Target arrival date.
- Store opening or project completion date.
- Any fixed delivery deadline.
If the date is flexible, say so.
Avoid asking for a delivery date without explaining the project schedule. A supplier may need to check stock, production, customization, packaging, and shipping before giving a realistic estimate.
Ask the supplier to separate the expected timing for:
-
Quotation and technical confirmation.
-
Order approval.
-
Production or preparation.
-
Quality checks.
-
Packaging.
-
Dispatch.
-
International transport.
-
Customs clearance and final delivery.
Not every supplier controls every stage. Shipping and customs timing may depend on carriers, ports, customs authorities, and local service providers.
A clear schedule helps the buyer see which dates the supplier can confirm and which are estimates.
Ask Suppliers to Break Down the Quotation
A quotation should make it clear what the buyer is paying for.
| Quotation Item | What the Supplier Should Provide | Quoted Amount | Currency | Remarks |
|---|---|---|---|---|
| Base Equipment Price | Unit price for each equipment model | Enter amount | Enter currency | Include model and quantity |
| Optional Features | Prices for additional features or accessories | Enter amount | Enter currency | List each option separately |
| Customization | Costs for dimensions, materials, or design changes | Enter amount | Enter currency | Describe the customization scope |
| Branding | Logo, label, or packaging customization costs | Enter amount | Enter currency | State included or optional items |
| Export Packaging | Packaging type and related costs | Enter amount | Enter currency | Include any special protection |
| Spare Parts | Prices for recommended spare parts | Enter amount | Enter currency | List quantities and part numbers |
| Warranty | Warranty coverage and any additional costs | Enter amount | Enter currency | State coverage and exclusions |
| Freight | Shipping cost and transport method | Enter amount | Enter currency | Specify route and shipping basis |
| Insurance | Insurance cost and coverage, if applicable | Enter amount | Enter currency | State coverage details |
| Installation or Commissioning | Service availability and related costs | Enter amount | Enter currency | State whether included |
| Payment Terms | Deposit, balance, and payment schedule | Not applicable | Not applicable | State accepted payment methods |
| Production Lead Time | Estimated production and preparation time | Not applicable | Not applicable | State the starting point for the lead time |
| Quotation Validity | Period for which the quoted prices remain valid | Not applicable | Not applicable | Include the expiration date |
Do not compare only the final total.
Ask suppliers to show the price for each product line and explain what is included.
Product price
Ask for:
- Model number.
- Product description.
- Unit price.
- Quantity.
- Line total.
- Currency.
- Quotation validity period.
If a supplier offers more than one model, ask for each option to be listed separately.
Optional items
Ask suppliers to list optional features and accessories separately.
This may include extra shelves, castors, special lighting, branding, or other project-specific items.
A separate price makes it easier to compare the standard product with the customized option.
Packaging and shipping
Ask whether the quotation includes:
- Export packaging.
- Inland transport.
- Port charges.
- Ocean or air freight.
- Insurance.
- Other stated shipping costs.
The exact items depend on the shipping term and the supplier's offer.
Ask the supplier to identify any costs that are not included.
Payment terms
Ask the supplier to state:
- Deposit requirement.
- Balance payment timing.
- Accepted payment method.
- Any payment-related conditions.
Do not assume that payment terms are the same for every supplier.
Taxes and import costs
Ask which taxes, duties, and local charges are included or excluded.
Import duties and taxes depend on the destination market, product classification, and local rules. The buyer may need to check these with a customs broker or local authority.
The RFQ should make the supplier's price scope clear, but it should not treat an estimate as a final customs assessment.
Ask for Technical Documents and Product Evidence
A quotation is more useful when it includes documents that help the buyer check the proposed equipment.
Ask suppliers to provide the documents that apply to the product and destination market.
Possible documents include:
- Product datasheet.
- Product catalogue.
- Dimension drawing.
- Electrical information.
- Installation instructions.
- Operation manual.
- Maintenance instructions.
- Warranty information.
- Product test or rating information.
- Applicable certificates or declarations.
Do not assume that every document applies to every product or market.
Product datasheet
A datasheet helps the buyer check the main product details.
It may include:
- Model number.
- External dimensions.
- Capacity.
- Temperature range.
- Voltage and frequency.
- Refrigerant type.
- Rated power or energy information.
- Door and shelf configuration.
- Weight.
The buyer should compare the datasheet with the RFQ requirements, not just the product photo.
Energy information
Energy use can affect the cost of operating equipment over time.
For covered commercial refrigeration product categories in the United States, ENERGY STAR and the U.S. Department of Energy publish information on product eligibility, energy performance, and purchasing guidance.
ENERGY STAR explains that certified commercial refrigeration products are tested against product-specific criteria. The U.S. Department of Energy also provides federal purchasing guidance for covered commercial refrigerators and freezers.
These programs do not cover every type of commercial refrigeration equipment. Buyers should check whether the exact product category is included before using a label or rating as a requirement.
For an RFQ, ask suppliers to provide the energy information and test basis that apply to the proposed model. If energy use is important to your project, state that it will be part of the quotation review.
Safety and food equipment standards
The required standards depend on the product type and destination market.
For example, ENERGY STAR's commercial refrigeration product criteria refer to applicable test procedures and additional third-party certification requirements for covered product classes. AHRI also publishes performance-rating standards for specific equipment categories, including walk-in coolers and freezers.
Do not ask for a standard simply because you have seen it on another product. First check whether it applies to the equipment and market in your project.
Ask the supplier to identify the standards, test reports, certificates, or declarations that apply to the exact model being offered.
Include Warranty and After-Sales Requirements
Warranty and service support should be part of the RFQ, not a question saved until after the order.
The buyer should understand what support is available if the equipment has a problem after delivery.
Ask suppliers to state:
- Warranty period.
- Which parts are covered.
- Whether labour is included.
- Whether travel or service costs are included.
- How warranty claims are handled.
- What information is needed to report a problem.
- Whether spare parts are available.
- How technical support is provided.
The supplier should explain any limits or exclusions.
Spare parts
For projects with several units, spare parts may be important.
Ask whether common parts can be supplied and whether the supplier can provide a recommended spare-parts list.
Do not assume that every part is included with the equipment. Ask for the price and availability of any parts you want to purchase separately.
Technical support
Ask how the supplier handles technical questions after delivery.
For an overseas project, it is useful to know:
- Which contact handles technical questions.
- Which languages are supported.
- Whether remote support is available.
- Whether service documents are provided.
- Whether local service partners are available in the destination market.
Make sure the supplier's answer is clear. A general promise of “full support” is not enough to understand the actual service arrangement.
Tell Suppliers How You Will Review Their Offers
A good RFQ should explain how quotations will be reviewed.
This does not need to be a complex scoring system. A short list of evaluation points can help suppliers prepare complete replies.
For example, the buyer may review:
- Match with required equipment type.
- Match with dimensions and capacity.
- Temperature performance.
- Electrical compatibility.
- Features and options.
- Energy information.
- Product documentation.
- Warranty and after-sales support.
- Unit price and total price.
- Packaging and shipping scope.
- Delivery schedule.
- Supplier response and clarification quality.
Not every point needs the same weight.
For one project, the main concern may be fitting the equipment into an existing site. For another, energy use or delivery timing may be more important.
Tell suppliers which requirements are mandatory and which are preferences.
This can help them offer suitable alternatives without changing a requirement that the buyer cannot compromise on.
Give Suppliers a Clear Reply Format
If several suppliers receive the same RFQ, ask them to reply in a similar format.
This makes the review process easier.
You can request that each supplier include:
-
Quoted model and model number.
-
Product description.
-
Technical datasheet.
-
Unit price and quantity.
-
Optional features and separate prices.
-
Packaging details.
-
Shipping term and named place or port.
-
Estimated preparation or production time.
-
Estimated shipping time, where available.
-
Payment terms.
-
Warranty details.
-
Applicable product documents.
-
Exceptions or differences from the RFQ.
-
Questions that need buyer confirmation.
The last two items are important.
A supplier may offer a model that is close to your requirement but not an exact match. Ask the supplier to list every difference.
For example, the proposed model may have a different width, shelf layout, electrical setup, or temperature range.
Do not let these differences stay hidden in a catalogue or product description. Ask the supplier to explain them in writing.
Use One RFQ for a Fair Supplier Comparison
A common mistake is sending different information to different suppliers.
One supplier may receive the full equipment list, while another receives only product names and estimated quantities. Their quotations will not be based on the same project.
For a fair comparison, send the same RFQ and supporting files to every supplier on your shortlist.
If you update the requirements, send the same update to all suppliers who are still being considered.
Keep a record of:
- The RFQ version.
- The date sent.
- The supplier's reply date.
- Questions and answers.
- Revised quotations.
- Any approved changes.
This is especially useful when several people are involved in the project.
It also helps prevent the team from comparing an old quotation with a revised offer.
Common RFQ Mistakes to Avoid
Even a detailed RFQ can create problems if important information is unclear.
Here are common mistakes buyers should avoid.
Mistake 1: Using only general product names
“Commercial refrigerator” is not enough for a detailed quotation.
Better approach: State the equipment type, intended use, and key requirements. If you do not know the exact model, describe the job the equipment must do.
Mistake 2: Leaving out the destination
A supplier cannot prepare a useful export quotation if the destination is unknown.
Better approach: Provide the country, city, and port or delivery location where available. Mark any provisional details.
Mistake 3: Mixing mandatory requirements with preferences
A supplier may treat every item as a strict requirement or may not know which details can be changed.
Better approach: Use separate labels such as “Required,” “Preferred,” and “Optional.”
Mistake 4: Asking for a price without technical information
A low price may be based on a model that does not meet the project's needs.
Better approach: Ask suppliers to identify the exact model and provide its datasheet.
Mistake 5: Comparing prices with different shipping scopes
One quotation may include freight while another may be based on a different delivery term.
Better approach: Ask each supplier to state the Incoterm and named place or port. Compare offers on the same basis.
Mistake 6: Forgetting installation conditions
A product may fit the planned space on paper but may not pass through a doorway or have enough room for ventilation and service.
Better approach: Include available site dimensions and access limits. Confirm final measurements before ordering.
Mistake 7: Treating estimated details as final
Early project information often changes.
Better approach: Mark estimates clearly and identify which details must be confirmed before the order.
Mistake 8: Not asking suppliers to list exceptions
A supplier may quote a similar model instead of the exact requirement.
Better approach: Ask for a written list of every difference between the RFQ and the proposed product.
A Practical Commercial Refrigeration RFQ Checklist
Before sending your RFQ, review the points below.
Project information
- Company and contact details.
- Business type and project purpose.
- Project location.
- Current project stage.
- Target purchase and delivery schedule.
Equipment requirements
- Equipment category.
- Model or reference product, if known.
- Estimated or confirmed quantity.
- Required dimensions.
- Capacity or storage needs.
- Door type and interior layout.
- Temperature requirement.
- Intended application.
Site and electrical information
- Available installation space.
- Access route and door dimensions.
- Ambient conditions.
- Ventilation conditions.
- Voltage and frequency.
- Phase and plug requirements, where known.
- Self-contained or remote system requirements, if known.
Features and customization
- Required features.
- Optional features.
- Branding and logo requirements.
- Colour and material preferences.
- Drawings, photos, or reference files.
- Items that need supplier confirmation.
Quotation and delivery
- Unit price and currency.
- Quantity and line total.
- Optional item prices.
- Packaging details.
- Shipping term and named place.
- Freight and insurance scope.
- Payment terms.
- Estimated preparation or production time.
- Estimated shipping and delivery time.
Documents and support
- Product datasheet.
- Dimension drawing.
- Electrical information.
- Applicable test reports or certificates.
- Warranty terms.
- Spare-parts information.
- Technical support details.
Supplier response
- Exact model number.
- List of exceptions or differences.
- Alternative models, if offered.
- Open questions.
- Quotation validity period.
You do not need every answer before sending the first RFQ. Some projects are still in the planning stage. The important thing is to show what is known, what is estimated, and what still needs to be confirmed.
Conclusion
A good commercial refrigeration RFQ gives suppliers a clear picture of the project. It explains what equipment is needed, how it will be used, where it will be installed, and how the order should be delivered.
The most useful RFQs do not simply ask for a low price. They help suppliers quote the right products and help buyers compare offers on the same basis.
Start with the project overview and equipment list. Add dimensions, capacity, temperature, electrical details, features, quantity, destination, and schedule. Then ask suppliers to provide model numbers, technical documents, clear prices, shipping details, warranty terms, and a list of any differences from your requirements.
If some details are not ready, mark them as estimates or items for confirmation. This keeps the process moving without hiding important gaps.
A clear RFQ can save time, reduce confusion, and help your team make a better buying decision before placing an order.